If you are considering a new garage floor, patio, or other coated surface, you may be wondering, how long does epoxy take to install?

For most projects, Southeast Epoxy completes the entire installation in just one day. That includes preparing the concrete, filling cracks, diamond grinding, applying the base coat, broadcasting the decorative flakes, and applying the polyaspartic top coat.

However, installation time and cure time are different. While most installations take one day, you still need to give the finished surface time to cure before using it.

An average-sized garage can typically be completed in just one day.
An average-sized garage can typically be completed in just one day.

How Long Does Epoxy Take to Install From Start to Finish?

In most cases, our crew can complete the installation process in one day.

The exact time depends on the size and condition of the concrete. However, our crew arrives with the equipment and materials needed to complete each step efficiently.

Most importantly, a one-day installation does not mean steps are skipped. Proper preparation is still a major part of the process.

First, We Prepare the Concrete

Diamond grinder used to prepare the concrete for epoxy.
Diamond grinder used to prepare the concrete for epoxy.

A long-lasting floor starts with proper preparation.

First, we inspect the concrete and fill cracks as needed. Next, we diamond grind the entire surface. Diamond grinding creates the proper surface for the product to bond to the concrete.

We do not believe in skipping this step. Simply applying a product over unprepared concrete can affect how well it performs.

Therefore, preparation is an important part of our one-day installation.

Next, We Apply the Base Coat

A strong, durable floor starts with a properly applied base coat.
A strong, durable floor starts with a properly applied base coat.

Once the surface is properly prepared, we apply the base coat.

The base coat bonds to the prepared concrete and creates the foundation for the rest of the floor. We use a polyurea base coat, which has flexibility and can move with the concrete underneath.

After the base coat is applied, we move directly into the decorative portion of the installation.

Decorative Flakes Are Added

Next, decorative flakes are broadcast across the surface.

Southeast Epoxy offers more than 30 flake color options. We can also create custom color combinations. Therefore, homeowners can choose a look that works well with their home and personal style.

The flakes also add texture and help disguise everyday dirt and wear.

Finally, We Apply the Polyaspartic Top Coat

The final step is the polyaspartic top coat.

Our top coat is UV stable, which helps prevent yellowing from sun exposure. For outdoor projects, we also include a slip-resistant additive for additional traction.

Once the top coat is applied, the installation is complete. Then, the curing process begins.

When Can You Walk on the Finished Surface?

Although most installations take just one day, the surface needs time to cure.

You can typically walk on the finished surface after 24 hours. However, vehicles need more time.

For garage floors and other areas that receive vehicle traffic, we recommend waiting 72 hours before driving on the surface.

Following these guidelines gives the product the proper amount of time to fully cure.

Built for everyday use and finished with a clean look that lasts.
Built for everyday use and finished with a clean look that lasts.

Why Is a One-Day Installation Helpful?

When homeowners search “how long does epoxy take to install,” they are often worried about losing access to their garage, patio, or driveway for several days.

Fortunately, the installation itself normally takes just one day.

That means you do not have to deal with a lengthy installation process. Instead, our crew completes each step in order while still focusing on proper preparation and attention to detail.

You get a durable, easy-to-maintain surface without turning the project into a week-long process.

Where Can Southeast Epoxy Install It?

Our product works well in many areas around the home.

Garage floors are one of the most popular choices. However, we also complete patios, driveways, walkways, porches, Carolina rooms, pool decks, and more.

The finished surface resists chemicals, hot-tire pickup, scuffs, and scratches. In addition, it is easy to clean and designed to handle everyday use.

How Long Does Epoxy Take to Install With Southeast Epoxy?

If you are still wondering, how long does epoxy take to install, the simple answer is most projects take just one day.

We fill cracks and diamond grind the surface first. Then, we apply the base coat and decorative flakes. Finally, we finish the surface with a durable polyaspartic top coat.

After installation, you can typically walk on the surface after 24 hours. Vehicle traffic can return after 72 hours.

Southeast Epoxy focuses on proper preparation from the beginning because a great-looking finished floor starts with what happens underneath it.

Ready to get your project started? Contact Southeast Epoxy today 843-999-1850 for a free, no-obligation estimate and learn how quickly you can have a new floor installed.

 
 
 

Comments


bottom of page